A small contractor should review seven numbers every month: total revenue, gross margin by job type, estimates sent vs. won, average job value, unpaid invoices and their age, labor hours vs. billed hours, and cash on hand. Each one points to a different problem — pricing, sales, collections, or crew efficiency — and each should trigger a specific action, not just a glance.
Most contractors who are busy assume they're doing fine. Trucks are rolling, the phone is ringing, jobs are getting done. But busy and profitable aren't the same thing, and the gap between them usually shows up in numbers nobody's looking at. You don't need a CPA or a dashboard full of charts. You need about 20 minutes a month and these seven.
Revenue
This is the obvious one, but check it two ways: total revenue this month vs. last month, and this month vs. the same month last year. A single month tells you almost nothing — contracting is seasonal and lumpy. What matters is the trend across three to six months. If revenue is flat while your lead volume is up, something is breaking between quote and close. If revenue is up but you feel more stressed than ever, the next few numbers will tell you why.
Gross Margin by Job Type
Total revenue hides the fact that some jobs make you money and others quietly don't. Break margin out by job type — kitchen remodels vs. small repairs, roof replacements vs. roof repairs, whatever your actual service lines are. If you don't already separate labor, materials, and overhead per job, start with how do contractors calculate labor cost and how to calculate profit on a contractor job after expenses. The action here is specific: if one category consistently runs thin, your price book for that category is wrong, not your crew. Fix the number, not the crew's work ethic.
Estimates Sent vs. Won (Close Rate)
Count how many estimates you sent this month and how many turned into booked jobs. A close rate under 30% usually means your pricing, your follow-up, or your qualifying is off — not that customers are cheap. A close rate over 70% can mean the opposite problem: you might be leaving money on the table by pricing too low. What is a good close rate on contractor estimates walks through realistic benchmarks by trade, so you're not guessing at what "good" looks like. The action: if close rate drops two months in a row, pull five lost estimates and find the pattern before you touch your prices.
Average Job Value
Divide monthly revenue by number of jobs completed. Watch this number over time, not in isolation. If it's shrinking, you're either taking on more small jobs to stay busy or discounting bigger ones to win them. Neither is automatically bad, but you should know which one is happening and whether it matches your plan. A contractor chasing volume on small jobs needs different scheduling and staffing than one chasing fewer, bigger projects — the math behind that trade-off is covered in how do contractors make money.
Unpaid Invoices and Their Age
Total dollars outstanding matters less than how old they are. An invoice sitting at 15 days is normal. One sitting at 60 is a collections problem, and it compounds — the longer it ages, the less likely you ever collect in full. Run an aging report monthly and set a rule: anything over 30 days gets a call, not another email. If this keeps happening with the same type of customer or job, read how to follow up on an unpaid contractor invoice and consider tightening deposit terms on the front end instead of chasing payment on the back end.
Labor Hours vs. Billed Hours
This is the number most small contractors never calculate, and it's often where the real profit leak is. Total up hours your crew clocked this month, then compare it to hours you actually billed customers for. A consistent 10-15% gap is normal — travel, cleanup, small callbacks. A 30% gap means jobs are running long without the estimate catching up, or time isn't being tracked accurately in the first place. If you're still tracking time on paper or in texts, that gap is probably bigger than you think — how to track employee time across multiple job sites is worth a look before you assume the problem is your crew's pace rather than your tracking.
Cash on Hand
Profit on paper and cash in the bank are different things, especially if you've got multi-visit jobs with deposits and progress payments. Know your cash balance against your next two to three weeks of payroll and material purchases, not just your bank app's balance today. Contractors run into trouble not because they're unprofitable but because cash is tied up in unpaid invoices or sitting in work-in-progress on a job that hasn't hit its next payment milestone. If your pricing already accounts for staged payments, revisit how to price jobs with multiple visits to make sure cash is coming in as the work happens, not all at the end.
Make The Monthly Review Actually Happen
The reason most contractors skip this isn't that the numbers are hard to understand — it's that pulling them together takes digging through three different tools and a shoebox of paper. If your estimates, invoices, job costs, and crew hours already live in one place, the monthly review is a 15-minute scroll instead of an afternoon of spreadsheet work. That's the gap Trusso is built to close: estimates tied to your own price book, invoicing and payment status in the same view as the job, and crew hours logged against the jobs they're tied to, so margin by job type and labor-vs-billed hours aren't separate reports you have to build by hand. Trusso runs flat-rate at $29, $59, or $99 a month depending on crew size, with a 14-day free trial and no contract — not a requirement for doing this review, just one less excuse to skip it.
How often should a small contractor actually sit down and review these numbers?
Monthly is the right cadence for most small contractors — frequent enough to catch a problem before it costs you a quarter, infrequent enough that it's not a burden. Cash on hand is worth a quicker weekly glance if you're tight on payroll.
Which of these numbers matters most if I only have time for one?
Gross margin by job type. Revenue and job count can look healthy while specific job types quietly lose money, and that's the number most likely to be hiding a pricing mistake you can fix immediately.
What's a healthy gap between labor hours and billed hours?
Roughly 10-15% is typical once you account for travel, cleanup, and small unbilled callbacks. A gap above 25-30% usually means jobs are running longer than estimated or time isn't being tracked accurately.
Do I need accounting software to track these, or can I do it manually?
You can track all seven with a spreadsheet if your records are clean, but most contractors find the hard part is pulling job-level data out of separate estimate, invoice, and timesheet tools. Software that keeps those connected makes the monthly review faster, not more accurate.
Should these numbers change how I price future jobs?
Yes — that's the point. If gross margin is thin on a job type or close rate is high enough that you're clearly underpricing, the monthly review should feed directly back into your price book, not just sit in a report.
Run your business the simple way
Try Trusso free for 14 days and send your first estimate in minutes.
Start 14-Day Free TrialKeep reading
What Is Construction Takeoff Software and Do Small Contractors Need It?
Takeoff software measures quantities—areas, lengths, counts—straight from plans so you can price a job without a tape measure and a calculator. Here's when a small contractor actually needs it.
Read articleComparisons7 Best Contractor Foreman Alternatives for General Contractors
Contractor Foreman covers a lot of ground but little of it goes deep. Here are 7 alternatives GCs switch to once they need real takeoff, sub bid-outs, or sharper scheduling.
Read article