The Trusso blog
Practical, no-fluff advice on estimating, getting paid, and running a leaner, more profitable trades business.
How to Track Estimates That Are Waiting for Customer Approval
A pending estimate without a system is just a guess about whether you'll get paid. Here's a simple six-stage pipeline for tracking every estimate from sent to won or lost.
What Should You Do When a Job Takes Longer Than Estimated?
A job running past the estimate isn't automatically a crisis — but how you handle the next 24 hours decides whether it becomes a dispute or just a longer job.
How to Tell a Customer Their Contractor Appointment Needs to Move
Rescheduling doesn't have to cost you the job or the relationship. Call early, give a real new time, a short reason, and a makeup — then confirm it in writing.
What Should a Contractor Do When a Customer Disputes an Invoice?
Respond fast, in writing, and separate the facts from the feelings. Show the approved estimate and change orders, offer one specific resolution, and know when to stop negotiating.
How to Price Recurring Lawn Maintenance Services
Build the per-visit price first, from drive time, property size, and crew minutes. Then package it into a flat monthly number so winter doesn't blow up your customer's bill — or your route.
What Photos Should Contractors Request Before Preparing an Estimate?
A direct list of the photos to ask for before quoting a job remotely — wide shots, damage close-ups, scale references, access routes, the panel or shutoff, and what to send customers in a text.
How to Turn a One-Time Customer Into a Repeat Customer
Repeat work is the cheapest lead you'll ever get. Here's how the end-of-job handoff, your records, and a well-timed check-in bring customers back without feeling like a sales pitch.
How Should Contractors Price Small Jobs That Take Less Than an Hour?
You price the trip, not the task. Here's how to set a minimum charge that covers drive time, setup, and paperwork — and when to waive it, batch it, or just say no.
How to Price a Kitchen Remodeling Job Without Missing Hidden Costs
Kitchen remodels don't lose money on cabinets and counters. They lose money on demo, temp kitchens, relocated outlets, and the trim work nobody wrote down. Here's how to catch all of it before you quote.
How Much Contingency Should Contractors Add to an Estimate?
A direct answer to how much contingency to build into a contractor estimate — and why contingency should never quietly turn into extra profit.
How to Revise an Estimate When a Customer Changes the Scope
A customer adds a bathroom, swaps materials, or decides to redo the whole kitchen instead of half of it — before you've swung a hammer. Here's how to revise the estimate the right way instead of just saying yes on the phone.
Timesheets for Small Contractor Crews: What Information Should You Capture?
A contractor timesheet should capture who, which job, what task, start and stop times, drive time, breaks, and notes on anything unusual — not just a weekly hours total.
Get tips in your inbox
Short, useful advice for running your contracting business — no spam, unsubscribe anytime.