Back to home

The Trusso blog

Practical, no-fluff advice on estimating, getting paid, and running a leaner, more profitable trades business.

Estimating

How to Price Flooring Removal and Disposal

Removal and disposal is where flooring jobs quietly lose money. Here's how to price it separately from installation, by material type, dump fees, and subfloor risk.

November 8, 20267 min read
Estimating

How Do You Estimate Travel Time and Fuel Costs for Service Jobs?

Price drive time as paid labor, add a per-mile vehicle cost, and draw a service-area line beyond which you charge a trip fee. Here's the math, with a worked example.

November 8, 20266 min read
Scheduling

How to Handle Schedule Changes When a Contractor Job Running Late

A late job doesn't have to wreck your whole day. Here's how to decide fast, protect the next customer, and keep everyone on schedule talking to you instead of a voicemail.

November 7, 20265 min read
Estimating

Handyman Minimum Charges: How to Set a Fair Price for Small Jobs

A handyman minimum charge should cover drive time, setup, and admin cost — usually a one- or two-hour minimum. Here's the math and how to explain it without sounding greedy.

November 7, 20267 min read
Estimating

How to Price an Electrical Service Call

A clear framework for pricing diagnostic fees, flat-rate repairs, permits, and after-hours work so you stop guessing and start charging what the job is worth.

November 7, 20266 min read
Customer Experience

How Should Plumbers Explain Diagnostic Fees to Customers?

State the diagnostic fee before the truck rolls, explain what it buys, and say plainly whether it's credited to the repair. Scripts for the phone and the front door included.

November 7, 20267 min read
Estimating

How to Price Cabinet Painting: A Contractor's Guide

Cabinet painting isn't wall painting with smaller brushes. Here's how to price per door and drawer front, account for degreasing and spray setup, and stop losing money on cure time.

November 6, 20268 min read
Sales

How Do You Explain Why Your Contractor Quote Is Higher Than a Competitor's?

When a customer says another bid came in lower, don't defend your total — compare scope. Here's a line-by-line script that shows what's actually in your price and what's missing from theirs.

November 6, 20267 min read
Scheduling

How to Create a Daily Schedule for a Small Contractor Crew

A repeatable morning routine for a two-truck crew: fixed start time, real drive time, a buffer for the job that runs long, and a five-minute end-of-day check.

November 6, 20266 min read
Lead Capture

Which Contractor Leads Deserve an Onsite Visit?

Not every lead is worth a drive. A simple five-factor score tells you whether to visit, estimate remotely, or walk away before you burn a morning on a job that was never going to book.

November 6, 20267 min read
Sales

How to Ask a Customer to Approve an Estimate Online

A verbal yes doesn't protect you. Here's how to get a written, dated approval on scope and price without making the ask feel like a contract ambush.

November 5, 20264 min read
Sales

What Questions Should Contractors Ask Before Scheduling an Estimate?

Before you put a site visit on the calendar, ask what the work is, where the property is, who'll be there, and what the timeline looks like. These eight questions save you wasted trips and wasted hours.

November 5, 20267 min read

Get tips in your inbox

Short, useful advice for running your contracting business — no spam, unsubscribe anytime.