You probably already know which job on your calendar brought in the most revenue this year. What you probably don't know is which type of job actually made you the most money per hour of crew time. Those are two very different questions, and contractors who only track the first one keep taking jobs that look great on the invoice and terrible on the bank statement.
The fix isn't complicated, but it does require pulling your completed jobs together and looking at them as a group instead of one at a time. Once you do, the answer is usually obvious — and usually surprising.
Why revenue per job is the wrong number to chase
A $14,000 kitchen remodel feels like a bigger win than a $600 drywall repair. But if the remodel took three weeks of crew time, needed a subcontractor, ran into a change order nobody charged for, and tied up your best lead carpenter the whole time, it might have cleared $1,400 in profit. The drywall repair took half a day and cleared $280. One of those jobs made you $47 an hour of crew time. The other made you $70. Revenue tells you what came in. It doesn't tell you what you kept.
This is the same trap covered in how contractors actually make money — margin beats volume, every time, and the only way to see margin by job type is to stop looking at jobs one at a time and start grouping them.
Group your last 20-50 completed jobs by type
Pull your job history — Trusso, QuickBooks, a spreadsheet, whatever you're using — and sort completed jobs into categories that match how you actually sell work. For a painting company that might be: interior repaints, exterior repaints, cabinet painting, drywall repair add-ons. For a handyman it might be: punch lists, TV mounting, small plumbing fixes, deck repairs. Don't get too granular at first — five to eight buckets is usually enough to see a pattern.
For each job you'll need three numbers, which you should already have if you've been closing out jobs properly:
- Total invoiced amount (what the customer paid)
- Total cost (materials, subcontractors, and labor at actual hours worked, not estimated hours)
- Crew hours spent on the job, from first arrival to final walkthrough
If you've been running estimates vs. actuals already, most of this is sitting in your estimate history. If you haven't, this is also a good reason to start — see how to compare estimated vs. actual labor hours for how to capture that going forward.
Calculate two numbers per job type, not one
Once your jobs are grouped, calculate two things for each category, averaged across every job in that bucket:
- Margin per job: (total invoiced minus total cost) divided by total invoiced, as a percentage
- Margin per crew hour: (total invoiced minus total cost) divided by total crew hours, as a dollar figure
Margin percentage tells you how healthy the pricing is. Margin per hour tells you how much that job type is actually worth to put on the schedule. You need both, because a job type can have a great margin percentage and still be a bad use of your crew's time if it takes forever to complete. A 45% margin on a job that takes two days is worth less per hour than a 30% margin on a job that takes two hours.
Here's a simplified example for a handyman business after sorting 40 jobs from the last quarter:
| Job type | Avg margin % | Avg margin per crew hour | Jobs this quarter |
|---|---|---|---|
| Punch lists | 38% | $61 | 14 |
| TV mounting / small installs | 52% | $84 | 9 |
| Deck repairs | 29% | $47 | 6 |
| Drywall patch & paint | 44% | $72 | 11 |
Look at that table and the story changes fast. TV mounting and small installs look like the smallest jobs on the schedule, and they probably are the lowest revenue line item of the four. But they're the most profitable per hour by a wide margin — $84 versus $47 for deck repairs. If this contractor spent the quarter chasing bigger deck jobs because they felt more like real work, they left money on the table every week.
Why the biggest job on the invoice is often the worst use of your time
This pattern shows up constantly once you actually run the numbers: the job type with the highest average ticket is rarely the job type with the highest margin per hour. Bigger jobs usually come with more variables — more trades to coordinate, more material price risk, more room for the job to take longer than estimated, more chances for scope to creep without a signed change order. Small, repeatable jobs are boring, but boring is profitable. You've priced them enough times to know exactly what they cost, your crew can do them without supervision, and there's less that can go sideways between the estimate and the final walkthrough.
That doesn't mean drop every big job. It means you should know, in dollars per hour, what each job type is actually worth to you before you decide how hard to chase it.
What to do once you have the numbers
The analysis is only useful if it changes what you do next week. For each job type, you land in one of three buckets:
- Price it up. If a job type has a decent margin per hour but it's below what your best categories earn, you don't need to drop it — raise the price on your next ten quotes for that type and see if demand holds. Most contractors are shocked how little pushback they get.
- Promote it more. If a job type has strong margin per hour and you're only doing a handful a quarter, that's a gap in your marketing or your sales conversation, not a pricing problem. Mention it more on calls, add it to your service pages, ask past customers if they need it.
- Stop taking it, or fix it, or both. If a job type consistently lands at the bottom on margin per hour, you either need to raise prices sharply, change how you scope it so hidden costs stop eating the margin, or stop offering it. There's no shame in turning down work that's been quietly subsidized by your better jobs for years.
Run this exercise quarterly, not once. Pricing, material costs, and crew speed all drift, and a job type that was your best earner last year can slide if you haven't repriced it. It pairs well with the broader habit described in which numbers a small contractor should review every month — this is one of the few that's worth checking less often but in more depth.
Where Trusso fits in
The hard part of this exercise is almost never the math — it's getting clean cost and hours data per job without digging through separate apps for estimates, timesheets, and invoices. In Trusso, every job carries its estimate, its actual crew hours, and its final invoice in one record, so pulling margin by job type is a matter of sorting completed jobs by category instead of rebuilding the numbers from scratch. Trusso runs flat-rate at $29/mo for an owner plus 2 crew, $59/mo up to 10 crew, or $99/mo unlimited, with no per-user fees, a 14-day free trial, and no contract.
You don't need new software to run this analysis once. You do need accurate job-level cost and hours data to run it every quarter without it becoming a half-day chore — and that's the difference between doing it once and actually using it to steer the business.
Run your business the simple way
Try Trusso free for 14 days and send your first estimate in minutes.
Start 14-Day Free TrialKeep reading
What Is Construction Takeoff Software and Do Small Contractors Need It?
Takeoff software measures quantities—areas, lengths, counts—straight from plans so you can price a job without a tape measure and a calculator. Here's when a small contractor actually needs it.
Read articleComparisons7 Best Contractor Foreman Alternatives for General Contractors
Contractor Foreman covers a lot of ground but little of it goes deep. Here are 7 alternatives GCs switch to once they need real takeoff, sub bid-outs, or sharper scheduling.
Read article